Committee Scope

Subcommittee 5, Tubular Goods (SC5)                        

API Staff Contact: Ben Coco (cocob@api.org)

Description

SC5 develops, approves, and maintains standards pertaining and related to the product design and manufacture of:

  • casing/tubing and accessories for well operations
  • line pipe for transmission and facility piping
  • drill pipe and drill stem elements for drilling operations
  • pipe threading and gauging and thread compounds

The standards under SC5 are also supported with additional resources having expertise in metallurgy, performance properties, sour service, and coiled pipe

SC5 Advisory/Resource/Task Groups

  • Advisory Groups
    • Manufacturer (MAG)
    • User (UAG)
  • Resource Groups
    • Non-destructive Testing (RGNDT)
    • Performance Properties (RGPP)
    • Sour Service Products (RGSSP)
    • Coiled Tubulars (RGCT)
    • Monogram Program (RGMP)
  • Task Groups
    • Oil Country Tubular Goods (TGOCTG)​
    • Line Pipe (TGLP)
    • Drill Stem Elements (TGDSE)
    • Threading, Gauging, and Compounds (TGTGC)
< August 2022 >
 Sun  Mon  Tue  Wed  Thu  Fri  Sat 
 31 
 1 
 2 
 3 
 4 
 5 
 6 
 7 
 8 
 9 
 10 
 11 
 12 
 13 
 14 
 15 
 16 
 17 
 18 
 19 
 20 
 21 
 22 
 23 
 24 
 25 
 26 
 27 
 28 
 29 
 30 
 31 
 1 
 2 
 3 
 
 
  
Edit
  
Notes
There are no items to show in this view of the "Links" list.
  
  
  
  
There are no items to show in this view of the "Shared Documents" document library.
 

 BallotsWP

Click here to return to previous page.

Ballot Information
  
ID5466
NameRP 7G-1, WI 7001, Development of 7G-1 from 7G split
Start Date04/15/2021
Closing Date05/28/2021
AssociateBenjamin Coco
CoordinatorBenjamin Coco
ProposalProvide performance properties and calculation methods for products in Spec 7-1, Spec 5DP, and others listed in RP 7G-2. RP 7G (16th Ed.) is for used drill stem equipment which has not had much maintenance and is being split in to three parts (7G-1, 7G-2, 7G-3). Its scope covers inspection, performance properties, and several other issues relating to design and use of the equipment. It was decided to have the performance properties covered by 7G-1, the inspection related content addressed by 7G-2 (already moved), and the remaining content placed in 7G-3 for the general use and operational aspects.
StatusClosed
ResultsIn Progress

Ballot Summary
StatisticsOutcomeNote
Affirmative13 
Negative0 
Abstain5 
Did Not Vote9 
Total Responses18 
Total Ballots27 
Response Rate66.67%Must be > 50%
Approval Rate100.00%Must be >= 66.67%
ConsensusYES 
 
Privacy Policy | Terms and Conditions | Legal Notices | Copyright - API. All rights reserved