There are currently no upcoming events.

 Committee Scope

SC 19 develops and maintains standards on:

  • Packers and Bridge Plugs - Spec 11D1
  • Electric Submersible Pumps - RP 11S1
  • Subsurface Flow Control Equipment - Spec 14A, RP 14B, Spec 14L
  • Completion Accessories - Spec 19AC
  • Perforator Evaluation - RP 19B
  • Chemical Injection Valves - Spec 19CI
  • Downhole Electronic Components - Spec 19E
  • Gas Lift Equipment - Spec 19G1, Spec 19G2, Spec 19G3, RP 19G4, RP 19G5, RP 19G6, RP 19G9, RP 19G10, RP 19G11, 19G15, 19GLHB
  • Inflow Control Devices - Spec 19ICD
  • Interval Control Valves - Spec 19ICV
  • Liner Hangers - Spec 19LH
  • Openhole Isolation Equipment - Spec 19OH
  • Downhole Perforating Tools - Spec 19PT
  • Sand Screen Equipment - Spec 19SS
  • Downhole Well Test Tools - Spec 19TT
  •  Subsurface Completion Isolation (Barrier) Valves and Related Equipment- Spec 19V
  • Explosives Safety - RP 67

You can get further details and scopes of these standards in the Exploration and Production section of the API Publications catalog at www.api.org/publications.

 
 
  
  
  
Variables_and_Units - RG.xlsVariables_and_Units - RGburklek@api.org
SI_Units_Calculators - RG.xlsSI_Units_Calculators - RGburklek@api.org
CSOEM SC-TG Chair's Orientation.pdfCSOEM SC-TG Chair's Orientationgoodmanr@api.org
API New Committee Member Orientation.pdfAPI New Committee Member Orientationgoodmanr@api.org
 Reference Documents
 API S1, 24th Edition
 API Format & Style Guide
 Forms (SR3, Sign-in Sheet)
 API Publications Catalog
 E&P Standards Errata & Addenda
 API Ballot System
 

 Open Ballots

Click here to return to previous page.

Ballot Information
  
ID5762
NameReaffirmation of ANSI/API 19G4, 1st Edition
Start Date04/12/2022
Closing Date05/10/2022
AssociateKatie Burkle
CoordinatorKatie Burkle
ProposalThis is an administrative ballot to reaffirm ANSI/API 19G4, 1st edition to ensure that the document stays in conformance with API's Procedures for Standards Development. Please note that any comments submitted regarding changes to the document will be considered outside the scope of this ballot and will be forwarded to the task group chairman for consideration in the next edition.
StatusClosed
ResultsIn Progress

Ballot Summary
StatisticsOutcomeNote
Affirmative18 
Negative0 
Abstain0 
Did Not Vote7 
Total Responses18 
Total Ballots25 
Response Rate72.00%Must be > 50%
Approval Rate100.00%Must be >= 66.67%
ConsensusYES 
 
Privacy Policy | Terms and Conditions | Legal Notices | Copyright - API. All rights reserved