MyCommittees > Standards > CRE > SCIMI

 Committee Scope

Welcome to the home page of the API Subcommittee on Inspection and Mechanical Integrity (SCIMI). The SCIMI develops industry standards that address inspection and mechanical integrity issues related to refining process equipment. Issues of particular interest to the SCIMI include: safe practices in the inspection of and repair of pressure vessels, aboveground storage tanks, and piping; equipment reliability; corrosion mechanisms; and reducing capital and maintenance costs. Each meeting of the subcommittee provides a forum for an information exchange on problems and opportunities where industry experts share experiences from operations around the world.

The SCIMI work program of documents includes:

API 510 - Pressure Vessel Inspection Code
API 570 - Piping Inspection Code
RP 572 - Inspection of Pressure Vessels
RP 573 - Inspection of Fired Heaters and Boilers
RP 574 - Inspection of Piping System Components
RP 575 - Inspection of Aboveground Storage Tanks
RP 576 - Inspection of Pressure-Relieving Devices
RP 577 - Inspection of Welding and Metallurgy
RP 578 - Material Verification Program for New and Existing Alloy Piping Systems
RP 580 - Risk-Based Inspection
RP 581 - Risk-Based Inspection - Base Resource Document
RP 583 - Corrosion Under Insulation
RP 584 - Integrity Operating Windows
RP 585 - Pressure Equipment Failure
RP 586 – NDT Methods for Equipmen​​​​t Damage Mechanisms
Bulletin 587 - Guidance for the Development of Ultrasonic Examiner Qualification Programs
RP 588 - Source Inspection for Fixed Equipment​​

​​
Bulletin 590 – Common Terms & Definitions for SCIMI Documents
Bulletin 592 – Elements of a Fixed Equipment Mechanical Integrity Program
Technical Advisory Group for RP 751, Section 6/Annex G/Annex H



Chair:   Mark Geisenhoff, Flint Hills Resources
Vice-Chair:   Justin Monroe, Chevron

API Contact: Christopher Hughes

Click on “Calendar of Events" under Links for meeting logistics and other information.

​ 

 Ballots

 Ballot IDStatusResultsOpensClosesDescription
Committee ID : 18052135SCIMI RP 581 Task Group
5727ClosedResolution Required03/22/202204/19/2022API RP 581 REDLINE Ballot
5810ClosedResolution Required07/05/202207/19/2022API 581 Table 2.D.3.3
5909ClosedResolution Required09/30/202211/01/2022API RP 581 REDLINE 4-week Ballot
6029ClosedResolution Required03/17/202304/14/2023API 581 Part 5, Section 7 and Appendix 5.B REDLINE
6030ClosedResolution Required03/17/202304/14/2023API 581 Table 2.D.3.3 REDLINE
6187OpenIn Progress10/02/202310/30/2023API 581 Part 5, Section 7 REDLINE
Committee ID : 676811SCIMI Subcommittee
5536ClosedIn Progress07/19/202110/05/2021API RP 582 Welding Guidelines for the Chemical, Oil, and Gas Industries
5578ClosedIn Progress09/09/202110/31/2021API 938 C - FOR COMMENT ONLY
5696ClosedResolution Required03/02/202203/30/2022API 572 Inspection Practices for Pressure Vessels 5th Ed 5th REDLINE Ballot
5727ClosedResolution Required03/22/202204/19/2022API RP 581 REDLINE Ballot
5735ClosedResolution Required03/24/202204/21/2022API 510 section 7.4.2 2nd ballot REDLINE
5736ClosedFail Resolution Required03/28/202204/26/2022API RP 580 4th - 3rd Ballot - REDLINE
5738ClosedIn Progress03/29/202205/03/2022API 653 Metrication
5750ClosedIn Progress03/29/202205/03/2022API 653-1008
5751ClosedIn Progress03/29/202205/03/2022API 653-1011 Nominal Thickness Definition
5714ClosedIn Progress03/11/202205/03/2022API 653-2054_e5 Annex G
5733ClosedResolution Required03/24/202205/09/2022API RP 586 Part 2 Inspection for HTHA - REDLINE Ballot
5848ClosedResolution Required08/30/202209/13/2022REDLINE - RP 572 Inspection Practices for Pressure Vessels 5th Ed (6th Ballot)
5881ClosedResolution Required09/15/202210/13/2022COMMENT ONLY - RP 592 Elements of a Fixed Equipment Mechanical Integrity Program
5883ClosedIn Progress09/19/202210/31/2022653-2054 Annex G: Qualification of Tank Bottom Examination Procedures and Personnel
5873ClosedIn Progress09/13/202210/31/2022API 653-2049 Alternate Inspection Deferrals
5909ClosedResolution Required09/30/202211/01/2022API RP 581 REDLINE 4-week Ballot
5880ClosedResolution Required09/15/202211/03/2022API 570 Piping Inspection Code
5872ClosedIn Progress09/13/202211/03/2022API 653-2024 Review Need for Revision to Annex C Checklist
5874ClosedIn Progress09/13/202211/03/2022API 653-2050 Verbiage change of “completely remove”
5875ClosedIn Progress09/13/202211/03/2022API 653-2051 Allow Limited Extension of Bottom Service Interval After Non-Complying Robotic Inspection Results
5876ClosedIn Progress09/13/202211/03/2022API 653-2053 Extent of Radiography in Shell Inserts and Door Sheets
5877ClosedIn Progress09/13/202211/03/2022API 653-2055 Inspection of Scaffold Cable Support
5871ClosedIn Progress09/13/202211/03/2022API-653-2022 F1
5924ClosedResolution Required10/07/202211/04/2022RP 580 4th Ed - 4th Ballot - REDLINE
5907ClosedIn Progress09/28/202211/08/2022API 653-1008 Corrosion Allowance Definition
5908ClosedIn Progress09/29/202211/08/2022API-653-1011 Nominal Thickness Definition
5960ClosedResolution Required11/30/202202/06/2023API RP 574 5th Ed. Inspection of Piping System Components
5984ClosedIn Progress02/01/202303/15/2023API 653-2041 Liquid Penetrant Test (PT) as Substitute for Vacuum Box and Solution Film Testing
5987ClosedIn Progress02/01/202303/15/2023API 653-2051 Allow Limited Extension of Bottom Service Interval After Non-Complying Robotic Inspection Results
6014ClosedIn Progress02/22/202304/05/2023API 653-1012 Overhaul of Differential Settlement Methods
6029ClosedResolution Required03/17/202304/14/2023API 581 Part 5, Section 7 and Appendix 5.B REDLINE
6030ClosedResolution Required03/17/202304/14/2023API 581 Table 2.D.3.3 REDLINE
5999ClosedResolution Required02/21/202304/17/2023API RP 576, Inspection of Pressure-Relieving Devices, 5th Ed, 2nd Ballot REDLINE ONLY
6020ClosedResolution Required03/10/202304/26/2023API 570 Piping Inspection Code 5th Ed REDLINE
6035ClosedIn Progress03/23/202305/04/2023API 653-2054 Annex G: Qualification of Tank Bottom Examination Procedures and Personnel
6062ClosedResolution Required04/17/202305/08/2023API Bulletin 592 Elements for the Establishment of a Fixed Equipment Mechanical Integrity Program COMMENT ONLY
6061ClosedResolution Required04/14/202305/09/2023API RP 574 5th Ed. Inspection of Piping System Components REDLINE ONLY
6070ClosedResolution Required05/03/202305/17/2023COMMENT ONLY: Introduction for API RP 586 NDE Methods for Equipment Damage Mechanisms
6129ClosedIn Progress08/18/202309/18/2023API RP 576 Inspection of Pressure-relieving Devices – Third Ballot Redline Only
6148OpenIn Progress09/12/202310/10/2023API RP 586 Introduction
6187OpenIn Progress10/02/202310/30/2023API 581 Part 5, Section 7 REDLINE
 
 
There are currently no upcoming events.
(More Events...)
  
  
  
20190521_Spring 2019 Refining Meeting Minutes_final.docx20190521_Spring 2019 Refining Meeting Minutes_finalorphanidesa@api.org
Minutes-SCIMI Executive Leaderhip Meeting (May 2019).docxMinutes-SCIMI Executive Leaderhip Meeting (May 2019)mark.geisenhoff@fhr.com
MINUTES - SCIMI Joint Meeting Agenda May 2019 rev 2.docxMINUTES - SCIMI Joint Meeting Agenda May 2019 rev 2mark.geisenhoff@fhr.com
API575_CommitteeAgenda_spring2019.xlsxAPI575_CommitteeAgenda_spring2019justin.t.monroe@gmail.com
Agenda - API 590 2019 Spring Meeting with Meeting Minutes.docxAgenda - API 590 2019 Spring Meeting with Meeting Minutesjustin.t.monroe@gmail.com
Mtg notes 575 05-7-2019.docxMtg notes 575 05-7-2019justin.t.monroe@gmail.com
API RP 580 Agenda (May 2019).docxAPI RP 580 Agenda (May 2019)bdray@marathonpetroleum.com
RP 586 Meeting Agenda Spring 2019.docxRP 586 Meeting Agenda Spring 2019bdray@marathonpetroleum.com
NDE TG Meeting Agenda Spring 2019.docxNDE TG Meeting Agenda Spring 2019bdray@marathonpetroleum.com
NDE task group mtg notes 11 13 18.docxNDE task group mtg notes 11 13 18bdray@marathonpetroleum.com
Mtg notes 941 Appendix E 11 13 2018.docxMtg notes 941 Appendix E 11 13 2018bdray@marathonpetroleum.com
Mtg notes 586 11 13 2018.docxMtg notes 586 11 13 2018bdray@marathonpetroleum.com
RP 575 Spring 2019 Agenda.pdfRP 575 Spring 2019 Agendabdray@marathonpetroleum.com
SCIMI Joint Meeting Agenda (May 2019).docxSCIMI Joint Meeting Agenda (May 2019)bdray@marathonpetroleum.com
API573_CommitteeAgenda_Spring2019.xlsxAPI573_CommitteeAgenda_Spring2019bdray@marathonpetroleum.com
API RP577 Agenda- Spring 2019 rev1.docxAPI RP577 Agenda- Spring 2019 rev1bdray@marathonpetroleum.com
API 581 Meeting Agenda - Spring 2019 r2.docxAPI 581 Meeting Agenda - Spring 2019 r2bdray@marathonpetroleum.com
Agenda - RP583 Spring 2019 Meeting.docxAgenda - RP583 Spring 2019 Meetingbdray@marathonpetroleum.com
API 941 Annex E Meeting Agenda Spring 2019.docxAPI 941 Annex E Meeting Agenda Spring 2019bdray@marathonpetroleum.com
Agenda - API 590 2019 Spring Meeting.docxAgenda - API 590 2019 Spring Meetingjustin.t.monroe@gmail.com
Agenda - Inspection Codes TaskGroup 2019 Spring Meeting.docxAgenda - Inspection Codes TaskGroup 2019 Spring Meetingjustin.t.monroe@gmail.com
(More Documents...)
  
  
  
Folder: 2020 Spring Ballot Results2020 Spring Ballot Resultsbdray@marathonpetroleum.com
Folder: 2019 Fall 653 Comments2019 Fall 653 Commentsgodoyj@api.org
Folder: 2012 Fall Ballot Results2012 Fall Ballot Resultscrimaudos@api.org
Folder: 2012 Spring Ballot Results2012 Spring Ballot Resultscrimaudos@api.org
Folder: 2011 Fall Ballot Results2011 Fall Ballot Resultscrimaudos@api.org
Folder: 2011 Fall - 653 RBI Ballot Results only2011 Fall - 653 RBI Ballot Results onlycrimaudos@api.org
Folder: 2011 Spring Ballot Results2011 Spring Ballot Resultscrimaudos@api.org
(More Documents...)
 API SCIMI Master Scorecard
 Reference API Governance Documents
 API ICP (Individual Certification Programs)
 API-SCCM (SubCommittee on Corrosion & Materials)
 API-SCAST (SubCommitttee on Above Ground Storage Tanks)
 Interpretations - API Refining Equipment Standards
 API - Calendar of Events
 Post Construction Committee Website
 Subcommittee on Repair & Testing Draft Documents
 Subcommittee on Repair & Testing Meetng Minutes
 
 