| |
| Committee ID : 677812 |  | SCAST - Subcommittee on Aboveground Storage Tanks |
|
 | 5702 | Closed | In Progress | 03/10/2022 | 04/21/2022 | API 620-2055 - Liner Thickness Rules - rev 0 |
 | 5740 | Closed | In Progress | 03/29/2022 | 05/03/2022 | API 620-1010 Update Anchor Strap Design Guidance for Cold Storage Tanks |
 | 5738 | Closed | In Progress | 03/29/2022 | 05/03/2022 | API 653 Metrication |
 | 5750 | Closed | In Progress | 03/29/2022 | 05/03/2022 | API 653-1008 |
 | 5751 | Closed | In Progress | 03/29/2022 | 05/03/2022 | API 653-1011 Nominal Thickness Definition |
 | 5714 | Closed | In Progress | 03/11/2022 | 05/03/2022 | API 653-2054_e5 Annex G |
 | 5734 | Closed | In Progress | 03/24/2022 | 05/05/2022 | API 651 4th Edition Final Ballot |
 | 5757 | Closed | In Progress | 04/05/2022 | 05/10/2022 | API 650-1097 Outlet Allowance |
 | 5758 | Closed | In Progress | 04/05/2022 | 05/10/2022 | API 650-1102 Annex C and H Terminology |
 | 5861 | Closed | In Progress | 09/13/2022 | 10/25/2022 | API 620-2059 Sub size impact testing for duplex stainless steels |
 | 5862 | Closed | In Progress | 09/13/2022 | 10/25/2022 | API 620-2061 Sidewall-to-Bottom Vacuum Box for Annexes Q and R |
 | 5863 | Closed | In Progress | 09/13/2022 | 10/25/2022 | API 620-2062 Reiterate the Spot RT Exemption in 7.17.2.1 |
 | 5865 | Closed | In Progress | 09/13/2022 | 10/25/2022 | API 650- 2022-F1 |
 | 5870 | Closed | In Progress | 09/13/2022 | 10/25/2022 | API 650 2064 Sub size impact testing for duplex stainless steels |
 | 5867 | Closed | In Progress | 09/13/2022 | 10/25/2022 | API 650-2059 Clarify Requirements for Welding over Protective Coatings in Section 9.2.1.6 |
 | 5868 | Closed | In Progress | 09/13/2022 | 10/25/2022 | API 650-2062 Verbiage change of “completely remove” that matches 653 |
 | 5869 | Closed | In Progress | 09/13/2022 | 10/25/2022 | API 650-2063 Annex S nozzle weld spacing |
 | 5883 | Closed | In Progress | 09/19/2022 | 10/31/2022 | 653-2054 Annex G: Qualification of Tank Bottom Examination Procedures and Personnel |
 | 5873 | Closed | In Progress | 09/13/2022 | 10/31/2022 | API 653-2049 Alternate Inspection Deferrals |
 | 5885 | Closed | In Progress | 09/20/2022 | 11/01/2022 | API 2015 9th Edition Ballot |
 | 5866 | Closed | In Progress | 09/13/2022 | 11/01/2022 | API 650-2828 Hydrotest requirements in Annex C&H |
 | 5872 | Closed | In Progress | 09/13/2022 | 11/03/2022 | API 653-2024 Review Need for Revision to Annex C Checklist |
 | 5874 | Closed | In Progress | 09/13/2022 | 11/03/2022 | API 653-2050 Verbiage change of “completely remove” |
 | 5875 | Closed | In Progress | 09/13/2022 | 11/03/2022 | API 653-2051 Allow Limited Extension of Bottom Service Interval After Non-Complying Robotic Inspection Results |
 | 5876 | Closed | In Progress | 09/13/2022 | 11/03/2022 | API 653-2053 Extent of Radiography in Shell Inserts and Door Sheets |
 | 5877 | Closed | In Progress | 09/13/2022 | 11/03/2022 | API 653-2055 Inspection of Scaffold Cable Support |
 | 5871 | Closed | In Progress | 09/13/2022 | 11/03/2022 | API-653-2022 F1 |
 | 5888 | Closed | In Progress | 09/28/2022 | 11/08/2022 | API 620-1027 |
 | 5894 | Closed | In Progress | 09/28/2022 | 11/08/2022 | API 650-1090 Steel Pan Updates |
 | 5896 | Closed | In Progress | 09/28/2022 | 11/08/2022 | API -650-1112 |
 | 5897 | Closed | In Progress | 09/28/2022 | 11/08/2022 | API 650-1113 Dynamic Hoop Stress Analysis Point |
 | 5907 | Closed | In Progress | 09/28/2022 | 11/08/2022 | API 653-1008 Corrosion Allowance Definition |
 | 5895 | Closed | In Progress | 09/28/2022 | 11/08/2022 | API-650-1104 Reconciliation of various pressure terms |
 | 5904 | Closed | In Progress | 09/28/2022 | 11/08/2022 | API-650-D146 |
 | 5908 | Closed | In Progress | 09/29/2022 | 11/08/2022 | API-653-1011 Nominal Thickness Definition |
 | 5889 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ- 620-D008 |
 | 5891 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-620-D009 |
 | 5892 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-620-D010 |
 | 5898 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-650-D139 |
 | 5899 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-650-D140 |
 | 5900 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-650-D141 |
 | 5901 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-650-D143 |
 | 5902 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-650-D144 |
 | 5903 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-650-D145 |
 | 5905 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-650-D147 |
 | 5906 | Closed | In Progress | 09/28/2022 | 11/08/2022 | INQ-650-D148 |
 | 5966 | Closed | Resolution Required | 12/24/2022 | 02/10/2023 | API 656 Aboveground Storage Tank Operations during Uncontrollable Environmental Events. COMMENT ONLY |
 | 5985 | Closed | In Progress | 02/01/2023 | 02/12/2023 | API 650-2028 Hydrotest requirements in Annex C&H |
 | 5981 | Closed | In Progress | 01/31/2023 | 03/14/2023 | API 620-2037 Add High Manganese Cryogenic Steel to API 620, Annex Q |
 | 5982 | Closed | In Progress | 01/31/2023 | 03/14/2023 | API 620-2048 Liquid Penetrant Test (PT) as Substitute for Vacuum Box and Solution Film Testing |
 | 5980 | Closed | In Progress | 01/31/2023 | 03/14/2023 | API 620-2063 Vacuum Testing while Substantially Empty |
 | 5983 | Closed | In Progress | 02/01/2023 | 03/15/2023 | API 650-2051 Liquid Penetrant Test (PT) as Substitute for Vacuum Box and Solution Film Testing |
 | 5986 | Closed | In Progress | 02/01/2023 | 03/15/2023 | API 650-2056 Plates Welded to Bottoms |
 | 5984 | Closed | In Progress | 02/01/2023 | 03/15/2023 | API 653-2041 Liquid Penetrant Test (PT) as Substitute for Vacuum Box and Solution Film Testing |
 | 5987 | Closed | In Progress | 02/01/2023 | 03/15/2023 | API 653-2051 Allow Limited Extension of Bottom Service Interval After Non-Complying Robotic Inspection Results |
 | 5995 | Closed | In Progress | 02/13/2023 | 03/27/2023 | API 650-2028 Hydrotest requirements in Annex C&H |
 | 6000 | Closed | In Progress | 02/21/2023 | 04/04/2023 | API 620-1023 Stress Limits and Seismic Clarifications |
 | 6001 | Closed | In Progress | 02/21/2023 | 04/04/2023 | API 620-1025 Rules for Compression-Ring Regions Exceeding 2 Inches Thickness |
 | 6003 | Closed | In Progress | 02/21/2023 | 04/04/2023 | API 620-1027 Anchor Embedment Design |
 | 6004 | Closed | In Progress | 02/21/2023 | 04/04/2023 | API 620-1029 Correcting References to ASCE 7 for Wind |
 | 6005 | Closed | In Progress | 02/21/2023 | 04/04/2023 | API 625-1011 Remove 100V plus 40H Seismic Combination for Base Shear Check |
 | 6015 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 12D e13 Specification for Field-welded Tanks for Storage of Production Liquids- COMMENT ONLY |
 | 6006 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 650-1090 Steel Pan Updates |
 | 6007 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 650-1091 Update Fixed Roof Definitions |
 | 6008 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 650-1094 Annex G Tanks - Wind Girders Designed as Open Roof Tanks |
 | 6010 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 650-1097: API 620 Studded Outlet Allowance |
 | 6009 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 650-1102 Update Annex C and H Terminology to Align with CELE |
 | 6011 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 650-1110 Wind Girder Walkway Open - B.min Clarification |
 | 6012 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 650-1112 Anchor Embedment Design |
 | 6013 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 650-1115 Correcting References to ASCE 7 for Wind |
 | 6014 | Closed | In Progress | 02/22/2023 | 04/05/2023 | API 653-1012 Overhaul of Differential Settlement Methods |
 | 6035 | Closed | In Progress | 03/23/2023 | 05/04/2023 | API 653-2054 Annex G: Qualification of Tank Bottom Examination Procedures and Personnel |
 | 6152 | Open | In Progress | 09/18/2023 | 10/17/2023 | API RP 2027 - 4th Edition |
 | 6157 | Open | In Progress | 09/20/2023 | 10/20/2023 | API 620 - Annex R shells over 2.00 inch thick |
 | 6158 | Open | In Progress | 09/20/2023 | 10/20/2023 | API 650 - Shell to Bottom Leak Checks by PT |
 | 6161 | Open | In Progress | 09/20/2023 | 10/20/2023 | API 653 - Inspection of Painter's Hitch |
 | 6159 | Open | In Progress | 09/20/2023 | 10/20/2023 | API 653 - Review Need for Revision to Annex C Checklist |
 | 6160 | Open | In Progress | 09/20/2023 | 10/20/2023 | API 653 - Revisions to Annex G on Bottom Exam Procedures and Personnel |
 | 6162 | Open | In Progress | 09/20/2023 | 10/20/2023 | API 653 - RT Required Around an Insert Plate |
 | 6156 | Open | In Progress | 09/19/2023 | 10/20/2023 | API Std. 625 - Prescriptive Leak Size for Membrane Containment System |
 | 6163 | Open | In Progress | 09/20/2023 | 10/27/2023 | [Inquiry] API 650 - Alternative Ultrasonic Computer Based Data Acquisition Technique |
 | 6164 | Open | In Progress | 09/20/2023 | 10/27/2023 | [Inquiry] API 653 - Butt Welds in a Lap Patch Plate |
 | 6165 | Open | In Progress | 09/20/2023 | 10/27/2023 | [Inquiry] API 653 - Repad Spacing in a Replacement Bottom |
| Committee ID : 18691571 |  | SCAST Refrigerated Tank Task Group (RTTG) |
|
 | 5497 | Closed | In Progress | 06/08/2021 | 06/29/2021 | RTTG Survey on possible API 620 provisions |
 | 5539 | Closed | In Progress | 07/21/2021 | 08/25/2021 | API 620-1010 Update Anchor Strap Design Guidance for Cold Storage Tanks Q & R REV-B |
 | 5882 | Closed | In Progress | 09/19/2022 | 10/03/2022 | API 620 Vacuum Testing while Substantially Empty- COMMENT ONLY |
 | 5911 | Closed | In Progress | 10/03/2022 | 10/24/2022 | API 620-1025 Rules for Compression-Ring Regions Exceeding 2 Inches Thickness FOR COMMENT ONLY |
 | 6107 | Closed | In Progress | 07/10/2023 | 08/07/2023 | RTTG 620-1024 Expand Table R-6 for Thicknesses up to 2.5" |