Skip to main content
Go Search

Subcommittee on Inspection

My Committees
My Rosters
  

 API Contact


Go Search

 Committee Scope

Welcome to the home page of the API Subcommittee on Inspection (SCI). The SCI develops industry standards that address inspection and mechanical integrity issues related to refining process equipment. Issues of particular interest to the SCI include: safe practices in the inspection of and repair of pressure vessels, aboveground storage tanks, and piping; equipment reliability; corrosion mechanisms; and reducing capital and maintenance costs. Each meeting of the subcommittee provides a forum for an information exchange on problems and opportunities where industry experts share experiences from operations around the world.

The SCI work program of documents includes:

API 510 - Pressure Vessel Inspection Code
API 570 - Piping Inspection Code
RP 572 - Inspection of Pressure Vessels
RP 573 - Inspection of Fired Heaters and Boilers
RP 574 - Inspection of Piping System Components
RP 575 - Inspection of Aboveground Storage Tanks
RP 576 - Inspection of Pressure-Relieving Devices
RP 577 - Inspection of Welding and Metallurgy
RP 578 - Material Verification Program for New and Existing Alloy Piping Systems
RP 580 - Risk-Based Inspection
RP 581 - Risk-Based Inspection - Base Resource Document
RP 583 - Corrosion Under Insulation
RP 584 - Integrity Operating Windows
RP 585 - Pressure Equipment Failure

Chair: David Wang, Shell
Vice-Chair: Steve Bolinger, BP   

Thank you for attending the API 2016 Spring Refining and Equipment Standards Meeting.  

The next API Refining Meeting is the 2016 Fall Refining and Equipment Standards Meeting planned for November 14-17, 2016 at the Hyatt Regency Hotel in New Orleans, LA. 

Click on “Calendar of Events" under Links for meeting logistics and other information.

 
 

 Meeting Information

Folder: 2016 - Fall2016 - Falldavid.wang@shell.com
Folder: 2016 - Spring2016 - Springjohn.harville@bp.com
Folder: 2015 - Fall2015 - Falldavid.wang@shell.com
Folder: 2015 - Spring2015 - Springdavid.wang@shell.com
Folder: 2014 - Fall2014 - Falljohn.harville@bp.com
Folder: 2014 - Spring2014 - Springjohn.harville@bp.com
Folder: 2011 - Spring2011 - Springcrimaudos@api.org
Folder: 2011 - Fall2011 - Fallcrimaudos@api.org
Folder: 2010 - Spring2010 - Springcrimaudos@api.org
Folder: 2010 - Fall2010 - Fallcrimaudos@api.org
Folder: 2013 - Spring2013 - Springcrimaudos@api.org
Folder: 2013 - Fall2013 - Fallcrimaudos@api.org
Folder: 2012 - Spring2012 - Springcrimaudos@api.org
Folder: 2012 - Fall2012 - Fallcrimaudos@api.org
NDE TG Meeting Agenda Spring 2016.docxNDE TG Meeting Agenda Spring 2016joseph.w.krynicki@exxonmobil.com

 Ballot Results

Folder: 2012 Fall Ballot Results2012 Fall Ballot Resultscrimaudos@api.org
Folder: 2012 Spring Ballot Results2012 Spring Ballot Resultscrimaudos@api.org
Folder: 2011 Fall Ballot Results2011 Fall Ballot Resultscrimaudos@api.org
Folder: 2011 Fall - 653 RBI Ballot Results only2011 Fall - 653 RBI Ballot Results onlycrimaudos@api.org
Folder: 2011 Spring Ballot Results2011 Spring Ballot Resultscrimaudos@api.org

 Links

  Reference Documents
  Calendar of Events
  Individual Certification Programs
  API Refining Meeting Information

 ASME Links

  Post Construction Committee Website
  Subcommittee on Repair & Testing Draft Documents
  Subcommittee on Repair & Testing Meetng Minutes
 

 Ballots

 Ballot IDStatusResultsOpensClosesDescription
Committee ID : 676SCI Joint
3939ClosedIn Progress08/16/201609/23/2016Reballot of RP 970, 1st Ed., Corrosion Control Documents
3938ClosedIn Progress08/15/201609/23/2016RP 934-A: Materials and Fabrication of Cr, Mo, V Steel Heavy Wall PV for Hi Temp Hi Pres H2 Service
3923OpenIn Progress08/11/201609/28/2016620-2018, Rev. 1: Revise the Thickness Limits for UT in Lieu of RT (for Std. 620)
3927OpenIn Progress08/11/201609/28/2016650-2020, Rev. 1: Revise the Thickness Limits for UT in Lieu of RT
3932OpenIn Progress08/17/201610/04/2016653-2011, Rev. 6: Clarify Figure 9.13 (Typical Weld-on Patch Plates on Tank Bottom Plates)
3933OpenIn Progress08/17/201610/04/2016653-2018, Rev 0: Credit in Table 6.1 for Release Prevention Barrier
3931OpenIn Progress08/17/201610/04/2016653-275, Rev 8: Weldability of Steel from Existing Tanks
3954OpenIn Progress08/30/201610/10/2016API Publ 587 3rd ballot draft for review
3950OpenIn Progress08/22/201610/11/2016653-1001, Rev. 1: Hot Tap Reinforcing
3962OpenIn Progress09/12/201610/28/2016Std 975, 1st Ed., Refractory Installation Quality Control-Inspect & Testing of Refract Brick Systems
3968OpenIn Progress09/16/201611/01/2016Std 976, 1st Ed., Refractory Installation Quality Cont-Inspect & Testing of Fiber Linings & Material
 
Privacy Policy | Terms and Conditions | Legal Notices | Copyright 2007 - API. All rights reserved