Skip to main content
Go Search

Subcommittee on Inspection

My Committees
My Rosters
  

 API Contact


Go Search

 Committee Scope

Welcome to the home page of the API Subcommittee on Inspection (SCI). The SCI develops industry standards that address inspection and mechanical integrity issues related to refining process equipment. Issues of particular interest to the SCI include: safe practices in the inspection of and repair of pressure vessels, aboveground storage tanks, and piping; equipment reliability; corrosion mechanisms; and reducing capital and maintenance costs. Each meeting of the subcommittee provides a forum for an information exchange on problems and opportunities where industry experts share experiences from operations around the world.

The SCI work program of documents includes:

API 510 - Pressure Vessel Inspection Code
API 570 - Piping Inspection Code
RP 572 - Inspection of Pressure Vessels
RP 573 - Inspection of Fired Heaters and Boilers
RP 574 - Inspection of Piping System Components
RP 575 - Inspection of Aboveground Storage Tanks
RP 576 - Inspection of Pressure-Relieving Devices
RP 577 - Inspection of Welding and Metallurgy
RP 578 - Material Verification Program for New and Existing Alloy Piping Systems
RP 580 - Risk-Based Inspection
RP 581 - Risk-Based Inspection - Base Resource Document
RP 583 - Corrosion Under Insulation
RP 584 - Integrity Operating Windows
RP 585 - Pressure Equipment Failure


Chair:   Steven Bolinger, BP
Vice-Chair:   Brent Ray, Marathon Petroleum

Thank you for attending the API 2016 Fall Refining and Equipment Standards Meeting. 

The next API Refining Meeting is the 2017 Spring Refining and Equipment Standards Meeting planned for May 08, 2017 to May 11, 2017 at Caesars Palace in Las Vegas, Nevada.

Click on “Calendar of Events" under Links for meeting logistics and other information.


 

 
 

 Meeting Information

Folder: 2016 - Fall2016 - Falldavid.wang@shell.com
Folder: 2016 - Spring2016 - Springjohn.harville@bp.com
Folder: 2015 - Fall2015 - Falldavid.wang@shell.com
Folder: 2015 - Spring2015 - Springdavid.wang@shell.com
Folder: 2014 - Fall2014 - Falljohn.harville@bp.com
Folder: 2014 - Spring2014 - Springjohn.harville@bp.com
Folder: 2011 - Spring2011 - Springcrimaudos@api.org
Folder: 2011 - Fall2011 - Fallcrimaudos@api.org
Folder: 2010 - Spring2010 - Springcrimaudos@api.org
Folder: 2010 - Fall2010 - Fallcrimaudos@api.org
Folder: 2013 - Spring2013 - Springcrimaudos@api.org
Folder: 2013 - Fall2013 - Fallcrimaudos@api.org
Folder: 2012 - Spring2012 - Springcrimaudos@api.org
Folder: 2012 - Fall2012 - Fallcrimaudos@api.org

 Ballot Results

Folder: 2012 Fall Ballot Results2012 Fall Ballot Resultscrimaudos@api.org
Folder: 2012 Spring Ballot Results2012 Spring Ballot Resultscrimaudos@api.org
Folder: 2011 Fall Ballot Results2011 Fall Ballot Resultscrimaudos@api.org
Folder: 2011 Fall - 653 RBI Ballot Results only2011 Fall - 653 RBI Ballot Results onlycrimaudos@api.org
Folder: 2011 Spring Ballot Results2011 Spring Ballot Resultscrimaudos@api.org

 Links

  API-SCI Master Scorecard
  Reference API Governance Documents
  API ICP (Individual Certification Programs)
  API-SCCM (SubCommittee on Corrosion & Materials)
  API-SCAST (SubCommitttee on Above Ground Storage Tanks)
  Interpretations - API Refining Equipment Standards
  API - Calendar of Events

 ASME Links

  Post Construction Committee Website
  Subcommittee on Repair & Testing Draft Documents
  Subcommittee on Repair & Testing Meetng Minutes
 

 Ballots

 Ballot IDStatusResultsOpensClosesDescription
Committee ID : 1805RP 581 Task Group
4093OpenIn Progress03/09/201704/20/2017API RP 581-12 SCC Damage Factor Ballot_r1
4097OpenIn Progress03/09/201704/20/2017API RP 581-AI 2016-003 Table 4.1-4.2 AST Exclusion
4098OpenIn Progress03/09/201704/20/2017API RP 581-AI2009-001 Climate drivers Table15-1
4094OpenIn Progress03/09/201704/20/2017API RP 581-AI2013-014_External wall loss_r2
4095OpenIn Progress03/09/201704/20/2017API RP 581-Ballot 2014-44 r1
4096OpenIn Progress03/09/201704/20/2017API RP 581-Ballot Cladding_Weld Overlay Correction_r5
4092OpenIn Progress03/09/201704/20/2017API RP 581-Part 1 Section 7 0 PRD - DM x MAWP_r02_combined
Committee ID : 676SCIMI Joint
3962ClosedIn Progress09/12/201610/28/2016Std 975, 1st Ed., Refractory Installation Quality Control-Inspect & Testing of Refract Brick Systems
3968ClosedIn Progress09/16/201611/01/2016Std 976, 1st Ed., Refractory Installation Quality Cont-Inspect & Testing of Fiber Linings & Material
4046ClosedIn Progress01/18/201703/03/2017653-2018, Rev. 1: Credit in Table 6.1 for Release Prevention Barrier
4047ClosedIn Progress01/18/201703/03/2017653-2020, Rev. 1: Welder ID Marking
4048ClosedIn Progress01/18/201703/03/2017653-2021, Rev. 1: Clarify Cross-Reference on Welding to Existing Shell HAZ in Reconstructed Tanks
4056ClosedIn Progress01/28/201703/14/2017653-2022, Rev. 0: Temporary and Permanent Attachments to Shell Plates
4081OpenIn Progress02/23/201704/10/2017653-1005 Rev. 0: Door Sheet Stiffening, Section 9.2.4
4102OpenIn Progress03/15/201704/24/2017RP 578 3rd Edition Ballot 2
4105OpenIn Progress03/20/201704/24/2017RP 934-A Recirc Ball: Material & Fab of Cr, Mo, V Steel Heavy Wall PV for Hi Temp Hi Pres H2 Service
 
Privacy Policy | Terms and Conditions | Legal Notices | Copyright 2007 - API. All rights reserved